Search
Close this search box.
Sign up for our weekly Newsletter

Gridserve opens two new Electric Super Hubs in the North East

Since 2021, the partnership has delivered over 320 EV charging points with 142 of those being High Power EV charging points across 18 locations. Gridserve and Moto are committed to levelling up EV charging infrastructure across the UK as electric vehicle ownership continues to rapidly increase before the ban on new petrol and diesel cars in 2030.  
ec86a120-f2ca-4ae8-957e-04acf74e9185

Share

6 April 2023

 

GRIDSERVE and Moto have announced that two new Electric Super Hubs at Moto Washington North and South on the A1(M) are now open for charging on one of the UK’s busiest motorways.

Each of the Electric Super Hubs have six 350kW-capable High Power chargers, joining the Gridserve Electric Highway network of 160+ locations.  

To make it as easy as possible for customers to charge their EV, all Gridserve Electric Hubs feature both CCS and CHAdeMO connectors, accept contactless payment and provide real-time status updates to popular EV charging maps.  The chargers are powered by 100% net zero carbon energy from the company’s pioneering hybrid solar + battery farms, supporting Gridserve’s aim to move the needle on climate change.  

Since 2021, the partnership has delivered over 320 EV charging points with 142 of those being High Power EV charging points across 18 locations. Gridserve and Moto are committed to levelling up EV charging infrastructure across the UK as electric vehicle ownership continues to rapidly increase before the ban on new petrol and diesel cars in 2030.  

Gridserve Chief Executive Toddington Harper said: “As the demand for electric vehicles and charging increases, it is vital we continue this pace to roll out the installation of High Power chargers to support EV drivers and those making the switch to electric. We look forward to continuing our expansion and installing hundreds more High Power chargers across the network.” 

 Moto Chief Executive, Ken McMeikan added: “As the largest UK Motorway Services Operator, we are continuing our mission to transform the UK’s rest stop experience and reducing range anxiety by revolutionising the EV charging experience for motorists on motorways is at the heart of our plans.”

Currently there are High Power GRIDSERVE Electric Super Hubs located at the following Moto service areas: 

·                Moto Rugby (11 High Power chargers) 

·                Moto Swansea (6 High Power chargers) 

·                Moto Exeter (12 High Power chargers) 

·                Moto Burton-in-Kendal (6 High Power chargers) 

·                Moto Thurrock (12 High Power chargers) 

·                Moto Severn View (6 High Power chargers) 

·                Moto Heston (11 High Power chargers) 

·                Moto Wetherby (12 High Power chargers) 

·                Moto Woolley Edge Northbound (6 High Power chargers) 

·                Moto Woolley Edge Southbound (6 High Power chargers) 

·                Moto Leigh Delamere (6 High Power chargers) 

·                Moto Reading Eastbound (12 High Power chargers) 

·                Moto Pease Pottage (6 High Power chargers) 

·                Moto Reading Westbound (12 High Power chargers) 

·                Moto Cherwell Valley (6 High Power chargers) 

·                Moto Washington Northbound (6 High Power chargers) 

·                Moto Washington Southbound (6 High Power chargers) 

 

Share this article

Facebook
Twitter
LinkedIn
WhatsApp
Reddit
Email

Want more motoring news?

Sign up here for our free weekly serving of motoring.

Sign up here for our free weekly serving of motoring.

Business Motoring

Business Motoring

Business Motoring is the motoring resource for small businesses and SME small fleets running company cars and business cars.

Latest news

Top